Coefficient
Consistently high performance

Midtown Manhattan
-
1.3 million square foot commercial office building,
-
Reshaped the building cooling load profile by controlling zone temperatures in one-third of the occupied space.
-
Reduced HVAC peak demand by 30%. Reduced day-time HVAC energy use by 350 MWh (or 19.4%) with a pre-occupancy charge of 75 MWh. Reduced energy price/volume risk.
-
Improved performance in the NYISO SCR Demand Response Program, the ConEd DLRP Program, and the NYISO capacity tag.
-
Anticipated the opportunities and challenges presented by the NY CLCPA, the NYC LL97, and the ConEd Non-Wires Program.

Sears World Headquarters
-
2.3 million square foot, 7 building commercial office campus.
-
Reshaped the building cooling load profile by controlling 1.1 million square feet.
-
Reduced the PJM capacity tag by 2.6 MW. Reduced day-time HVAC energy use by 415 MWH with a pre-occupancy charge of 100 MWh. Reduced energy price/volume risk.
-
Challenge -- 2018 was the 2nd hottest Chicago cooling season in 60 years.

Willis Tower
-
4 million square foot commercial office building,
-
Reshaped the building cooling load profile by controlling 13 of 96 floors, roughly 20% of the occupied space.
-
Reduced peak demand by 2 MW. Reduced day-time HVAC energy use by 1,530 MWh with a pre-occupancy charge of 630 MWh. Reduced energy price/volume risk.
-
Automated participation in the PJM Economic Demand Response Program on 62 weekdays over 4 months.
-
For more, see this U.S. DOE website.

Chicago Loop
-
960,000 square foot commercial office building,
-
Reshaped the building cooling load profile by controlling 11 of 51 floors, roughly 22% of the occupied space.
-
Reduced HVAC monthly peak demand by 20-30%. Reduced monthly day-time HVAC energy use by up to 20%.
-
Automated participation in the PJM Economic DR Program.

Chicago Loop
-
800,000 square foot commercial office building,
-
Reshaped the building cooling load profile by controlling all 40 floors.
-
Reduced HVAC monthly peak demand and energy use 20%.
-
Implemented AHU and chiller staging strategies.